View Single Post
  #1   Report Post  
Posted to microsoft.public.excel.charting
THE BIG O THE BIG O is offline
external usenet poster
 
Posts: 5
Default Best chart method

Hello,

I am helping someone with a chart and I am a bit stumped. The chart needs
to show for each month the number of items that are assigned or unassigned.
Not only that but each assigned and unassigned quantity of items is of a
certain number of days which is to be shown in the chart as well. (0-29,
30-59, 60-89, and 90+).

The boss wants a line graph but I am not sure this works. I have not
created very many charts and most of those have been simple bar or pie
charts. This is a little over my head.

Would a line graph be possible and if not, what is the best way of doing this?

thanks

Michael