I am writing a sheet containing multiple products. For these different
products there are certain steps of manufacturing that require time.
What I am wanting to do is when a certain product is entered into the
sheet I want the time in just total hours format to be displayed under
the steps that are listed in the sheet. I have made a product list on
another sheet and have that linked with data validation. These
products are listed in cell A1 with a pull down menu using Namedefine
and data validation so when I pull certain products out I get this
Cell A1 is product A, but I want Cell C1 to display 2;Cell D1 to
display 4;Cell E1 to display 6;Cell F1 to display 3. then on Cell B1
I will pull down product B and then I will need Cell C1 to display 4;
Cell D1 to display 2; Cell E1 to display 5.
This is what I am wanting to do unless there is an easier way cause
this could go on with about 20 to 100 different products.
Here is an example of a current table. This table could grow much
larger.
Product Chg EvDy TfrDeo Neu Dist Fil Clean
BDP
Product A 2 2 2 2 4 6 19
Product B 4 5 3 2 2 3 19
Product C 2 4 2 3 3 4 20
Ed
--
changetires
------------------------------------------------------------------------
changetires's Profile:
http://www.excelforum.com/member.php...o&userid=35414
View this thread:
http://www.excelforum.com/showthread...hreadid=554236