links
I have a list of documents that are linked to one Master document.
My problem is this, when I change the documents without the links, like
insert rows, etc., the Master document looses the links. If I am linked to
A2, and A2 becomes A3, the Master Document doesn't see the change. Why?
Is there a way to have the Master document change the cells they are linked
to as the linked cells move?
I hope this clear!
Thanks!
|