Thread: Calculate date
View Single Post
  #1   Report Post  
Anthony
 
Posts: n/a
Default Calculate date

I am setting up a spreadsheet, where the result of a function is a date to be
stored in J15, which is always a Saturday. How can I setup the preceding 6
cells to have the corresponding dates based on that Saturday?