Thread
:
Number value based on date function
View Single Post
#
2
Posted to microsoft.public.excel.worksheet.functions
Jeroen
Posts: n/a
Number value based on date function
Hey Neil,
I wouldlike to look at your problem.
You can send the sheet to
--
Jeroen van Nieuwkerk
"Neil M" wrote:
OKay here is what I have. I have a drawing log for a construction site that I
am trying to create. Now, we regularly get revisions to the drawings and they
have to be tracked. Right now we are up to revision 5.
So, in cell D46 I have a validated list of all the dates that we received
the revisions. In cells G46 through N46 there are blanks for each revision.
What my boss wants is if 10/19/2004 corresponds to revision 4 he wants G46 to
show "0", H46 to show "1", I46 to show "2" etc.
I have two columns off to the side one has the date and the adjancent has
the corresponding revision number. I have named this list REV_DATES.
Is there a way so that if I enter 10/19/2004 in D46 that cells G46 through
K46 will show 0, 1, 2, 3, 4 respectively?
Is this enough info? I can email the sheet if needed
Thanks
NeilM
Reply With Quote