Posted to microsoft.public.excel.worksheet.functions
ScottO
 
Posts: n/a
Default Look At Two Dates

Then (with a minor mod to my first suggestion), does this work for
you ...
=MAX(DAYS360(if(IsBlank(S24),R24,S24),U24),0)
Rgds,
ScottO

"roy.okinawa" wrote in message
...
| Thanks for the wake-up call. Been a busy day so far. My fingers
and brain
| are not cooperating. Here is what I need added to OP formula:
|
| R and U are currently totaling max days.
|
| If I put a date in S, I want S and U to total. R will still have
its
| original date. S is a revised date which overrides R. S will be
blank if no
| revision required.
|
| Thanks again.
|
| "ScottO" wrote:
|
| Sorry Roy, but I'm having trouble understanding the requirement.
| If you look at your explanation in your first posting and the
| explanation in your second posting they seem (to me) to be
| contradictory.
| In 1st post you said "... if I put a date in S24 ... I want the
| formula to total the days between R24 and S24", but in 2nd post
you
| say "... once a date is input in S, then S and U should total the
| days".
| From the 1st post I thought you what you wanted was "R to U,
unless
| there was an entry in S in which case it should be R to S".
| Please clarify.
| Rgds,
| ScottO
|
| "roy.okinawa" wrote in
message
| ...
| | This still totals the days between R and U.
| |
| | Even though U has a date, once a date is input in S, then S and
U
| should
| | total the days. S will not always have a date
| |
| | "ScottO" wrote:
| |
| | One way that ought to give you what you want ...
| | =MAX(DAYS360(R24,if(IsBlank(S24),U24,S24)),0)
| | Rgds,
| | ScottO
| |
| | "roy.okinawa" wrote in
| message
| | ...
| | | Have this formula: =MAX(DAYS360(R24,U24),0)
| | |
| | | Now I need to add this:
| | |
| | | Even though this is totaling the days bewtween R24 and U24,
if
| I
| | put a date
| | | in S24 (this would override U24), I want the formula to
total
| the
| | days
| | | between R24 and S24.
| | |
| | | I need to keep the date in U24. It is the original work
date.
| S24
| | would be
| | | a revised date.
| |
| |
| |
|
|
|