View Single Post
  #1   Report Post  
Posted to microsoft.public.excel.charting
Luke Williams
 
Posts: n/a
Default Probability Graph - help please

Hello,

I am trying to create a probability graph. On the x-axis, I would like to
have days (365 days). The Y-axis would represent a volume of liquid (from
0.4 to 32.0L). This water is shipped to a location every 6 days. The water
comes either in 0.4 L, 23.5 L or 32.0 L per shipment. How would you
construct a graph that would visually show this knowing also that you can
only have two consecutive shipments of the same quantity (ie. Shipment 1=0.4,
shipment 2=0.4 but shipment 3 could not equal 0.4).

Thanks so much for your help