Thread: Update links
View Single Post
  #1   Report Post  
Posted to microsoft.public.excel.misc
Brisbane Rob
 
Posts: n/a
Default Update links


We run a speadsheet which has to update over 7,000 links over a very
slow network. Is there any way of showing what percentage of the links
have been updated as the users wait (up to two minutes), and can it be
triggered from the "Update Links?" button?

Thanks in advance for any ideas.


--
Brisbane Rob
------------------------------------------------------------------------
Brisbane Rob's Profile: http://www.excelforum.com/member.php...o&userid=25096
View this thread: http://www.excelforum.com/showthread...hreadid=488134