View Single Post
  #1   Report Post  
Bryan J Bloom
 
Posts: n/a
Default first time linking worksheets need some info and help

I'm trying to link 4 cells with dates in them to be inputted into the second
sheet for calculation. BUT the info is in a cycle. So basically I need it to
link and stay. But when I do the next cycle, I need the info to change. I do
have a column that is counting the cycles. So can I make it so it'll link the
info until the cycle number changes? (a Formula???) if so how do i put a link
and formula together.

Also if this is figured out,can you possibly link a cell to two different
worksheets within a workbook?

Thank You
Bryan Bloom