Have you checked that the calendar control is available on the machine you're
distributing to?


"nathan_savidge" wrote:

Hi,

I have a sheet with a calendar control on a user form, just the calendar
control 11.0. This works fine, however when i distribute the sheet, the
users get an error message €ścould not load the object because it was not
valid on the machine€ť

When i save and open the sheet myself, i do not get the additional control
for the calendar control in my tool box, but the calendar control still works.

Can anyone advise.