Thread: 'Canyon' Graph
View Single Post
  #1   Report Post  
Ken Dog
 
Posts: n/a
Default 'Canyon' Graph

A canyon graph is an awesome tool to demonstrate the costs versus benifits of
a project. It starts at the $0 line, assuming the project is not done.
Then, the canyon makes steps down, proportional to the costs. When all the
costs are included, then the benefits are added, with largest benefits first.
Would like to do this in excel, instead of drawing one manually. Is there
an add on, or a template?