Can I have the TAB name be a calculated field...?
Oh, and I like the date in the TAB to be formatted, like 6/4/07.
Thanks
Kelvin
"Kelvin Beaton" <kelvin at mccsa dot com wrote in message
...
I have a spreadsheet that has a calculated date field in "=H34+3"
I would love for the TAB to equal that value.
I think I've tried to figure this out a long time back, but I think I got
stuck becasue it is a calculated fileld.
Anyone know if this can be done, and how?
Thanks
Kelvin
|