Default Calendar Control Changing System Date

I have added a calendar control to one of my forms, and now every time
that I select a date and execute the macro behind the form, the system
date changes. Has anyone else experienced this? Is there a
work-around?

I have added the Microsoft Calendar Control 11.0 in the references. m

I just have never experienced it modifying the system date before.

Thanks for any assistance.