One way:
If your times are in XL time format (e.g., 10:00), then
=CEILING(D30*3,0.25)
(The 3 comes from 8 hours being 1/3 of a day, so hours need to be
multiplied by 3).
If instead your times are entered as number of hours (e.g., 10.0, 10.5),
then
=CEILING(A1/8,0.25)
In article ,
toastnbutter
wrote:
I am trying to find the best formula to demonstrate the length of time
it takes to perform tasks and then round them to quarter day
increments. For example, a task takes 10 hours to perform I need a
formula that will take the 10 hours and display 1.25 (assuming an 8
hour work day).
By the same token though if it is 10.5 hours it should roundup to 1.5
and not display 1.3.
Any help would be greatly appreciated.