Using XL2k, when I put 3/6/2005 in A1 and =A1+7 in B1 and drag B1 out to I1,
I get:
B1= 3/13/2005
C1= 3/20/2005
D1= 3/27/2005
E1= 4/3/2005
F1= 4/10/2005
G1 = 4/17/2005
H1= 4/24/2005
I1= 5/1/2005
"No 4/31/2005 in sight"
Is this not what you asked for?
"WHERE" are you getting the 4/31/2005?, and by what means?
Vaya con Dios,
Chuck, CABGx3
"Squirel Eater" wrote in message
...
Yes I agree, but, it will return a date of April 31, 2005 even though this
date is not true. I am looking for a surefire solution. By the way
Last day of the this month:
=DATE(YEAR("04/01/2005"),MONTH("04/01/2005")+1,1)-1
returns 4/30/2005
Thanks for the input
"CLR" wrote:
If you put a date in A1, then in B1 put
=A1+7, and copy it over to as many columns to the right as you
wish.......each will increment 7 days.
Vaya con Dios,
Chuck, CABGx3
"Squirel Eater" <Squirel wrote in
message
...
How can I set a date in subsequent columns that are 7 days apart? I
have
tried
=DAY(IF(B3="","",B3+7)) but if given a date March 6, 2005 it will
show 31
days in April. Any suggestions?