Hi
try
=IF(OR(WEEKDAY(J6)=1,WEEKDAY(J6)=7),"True","False" )
Frank
If the entered date is either Saturday or sunday, then calculation
should take place.
=IF(OR(WEEKDAY(J6)=1,7),"True","False")
Is the above formula is correct?
---
Message posted from http://www.ExcelForum.com/