How can I add hours and minutes then multiply by cost per hour?
 
I'm a handyman who works on many apartments and homes and many little
projects within those places. I need to let the real estate firm know what I
did and how long it took to do it. I need to put together a time sheet
showing what time I started a project and what time I ended that project. A
column with the total number of hours and minutes after that. A total number
of hours and minutes at the bottom of that column. And a total cost for the
hours worked. I need a column with description of what I did and then at the
very bottom a total for the entire job. Does anyone have any idea how I can
do this? I've tried and failed miserably, and I thought I was pretty
advanced in the use of Excel! So now I ask, rather, beg for help. Anyone????

Peo Sjoblom

How can I add hours and minutes then multiply by cost per hour?
 
Just put the times like start 08:00 AM end 05:00 PM for instance in A1 start
and B1 end

then

=B1-A1


then total at the end of the week or whenever

=SUM(C1:C5)


format as [hh]:mm

then finally multiply with 24 and the payrate

=C2*24*Pay_Rate

and format as currency or general


--

Regards,

Peo Sjoblom

http://nwexcelsolutions.com



"Tom DiBell" <Tom wrote in message
...
I'm a handyman who works on many apartments and homes and many little
projects within those places. I need to let the real estate firm know
what I
did and how long it took to do it. I need to put together a time sheet
showing what time I started a project and what time I ended that project.
A
column with the total number of hours and minutes after that. A total
number
of hours and minutes at the bottom of that column. And a total cost for
the
hours worked. I need a column with description of what I did and then at
the
very bottom a total for the entire job. Does anyone have any idea how I
can
do this? I've tried and failed miserably, and I thought I was pretty
advanced in the use of Excel! So now I ask, rather, beg for help.
Anyone????