LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 17
Default change order of 5 letter word based on another cell containing 5 numbers

Hi

This is difficult to explain so please bear with me

Imagine a 5 letter word in cell A1 (ABCDE)
and a 5 digit number in cell A2 (12345)
then cell A3 =ABCDE

if cell A2 =23451
then I need a formula to give the answer as BCDEA in cell A3

A2 is the order I need the letters to be displayed.

Can it be done by a formula?

Can someone help as I dont even know where to start

Kenny W
XP pro and Office 2003


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
display one letter of a word in a cell r_chaud Excel Worksheet Functions 2 December 4th 07 09:39 PM
change first letter of a word for an entire column lori12844 Excel Discussion (Misc queries) 5 May 30th 07 06:06 AM
Change certain numbers & blank cells into a letter Kat Excel Discussion (Misc queries) 1 February 8th 07 01:21 AM
Default Capital letter for 1st letter of a word Jeff Excel Discussion (Misc queries) 6 July 10th 06 08:36 AM
I want to type the letter Y in a cell and have the word Yes appea. jhardw New Users to Excel 3 April 2nd 05 12:24 AM


All times are GMT +1. The time now is 07:06 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"