Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 1
Default Excel

I have a spreadsheet that tracks production of an assembled part. I manually
enter in the dates starting from left to right of the start of assembly of
the part to testing, and other associated functions. the last date entered is
the expected date that the assembled part is placed into stock.

Knowing the start date and how long it takes from finish to end, can I
create a formula to enter in the start date and have the spreadsheet
extrapilate fill in the associated dates to completion baseed on seperate
functions of assembly?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +1. The time now is 01:58 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"