ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Worksheet Functions (https://www.excelbanter.com/excel-worksheet-functions/)
-   -   Summing (https://www.excelbanter.com/excel-worksheet-functions/164873-summing.html)

WRC

Summing
 
Need to add Qual Hardware+No Charge+DAT Hardware+Outside Lab+Purchased Items
for all projects month wise.
All Projects are of same format (i.e they are at equally placed for ex: gap
between proj Eng. of project 1 & Proj Eng project 2 is 14 rows.


Jan Feb Mar Apr
Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 5 5 5 5
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 10 10 10 15
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 8 8 8 8
Outside Lab ($'s) 3 3 3 3
Purchased Items ($'s) 2 2 2 2

Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 1 1 1 1
Test Tech (Hrs) 2 2 2 2
Qual Hardware ($'s) 3 3 3 3
No Charge ($'s) 5 5 5 5
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 6 6 6 6

Project:
Proj Eng (Hrs) 2 2 2 2
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 3 3 3 3
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 5 5 5 5
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 9 9 9 9
Project:
......................
....................


Pete_UK

Summing
 
Have just replied to your previous post - this has the added dimension
of different months, but the formulae will be similar. Instead of
B1:B1000, adjust this for the column you want to add.

Hope this helps.

Pete

On Nov 5, 10:20 pm, WRC wrote:
Need to add Qual Hardware+No Charge+DAT Hardware+Outside Lab+Purchased Items
for all projects month wise.
All Projects are of same format (i.e they are at equally placed for ex: gap
between proj Eng. of project 1 & Proj Eng project 2 is 14 rows.

Jan Feb Mar Apr
Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 5 5 5 5
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 10 10 10 15
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 8 8 8 8
Outside Lab ($'s) 3 3 3 3
Purchased Items ($'s) 2 2 2 2

Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 1 1 1 1
Test Tech (Hrs) 2 2 2 2
Qual Hardware ($'s) 3 3 3 3
No Charge ($'s) 5 5 5 5
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 6 6 6 6

Project:
Proj Eng (Hrs) 2 2 2 2
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 3 3 3 3
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 5 5 5 5
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 9 9 9 9
Project:
.....................
...................




Sandy Mann

Summing
 
Isn't it just in the row below Purchased Items ($'s)

=SUM(B7:B11)

which when copied to Columns C, D & E will adjust, as it will when the
formula in B12 is copied and pasted into B26

or am I missing something?

--
HTH

Sandy
In Perth, the ancient capital of Scotland
and the crowning place of kings


Replace @mailinator.com with @tiscali.co.uk


"WRC" wrote in message
...
Need to add Qual Hardware+No Charge+DAT Hardware+Outside Lab+Purchased
Items
for all projects month wise.
All Projects are of same format (i.e they are at equally placed for ex:
gap
between proj Eng. of project 1 & Proj Eng project 2 is 14 rows.


Jan Feb Mar Apr
Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 5 5 5 5
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 10 10 10 15
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 8 8 8 8
Outside Lab ($'s) 3 3 3 3
Purchased Items ($'s) 2 2 2 2

Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 1 1 1 1
Test Tech (Hrs) 2 2 2 2
Qual Hardware ($'s) 3 3 3 3
No Charge ($'s) 5 5 5 5
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 6 6 6 6

Project:
Proj Eng (Hrs) 2 2 2 2
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 3 3 3 3
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 5 5 5 5
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 9 9 9 9
Project:
.....................
...................





WRC

Summing
 
Thanks Pete_UK

That is what I wanted..........

Thanks

"Pete_UK" wrote:

Have just replied to your previous post - this has the added dimension
of different months, but the formulae will be similar. Instead of
B1:B1000, adjust this for the column you want to add.

Hope this helps.

Pete

On Nov 5, 10:20 pm, WRC wrote:
Need to add Qual Hardware+No Charge+DAT Hardware+Outside Lab+Purchased Items
for all projects month wise.
All Projects are of same format (i.e they are at equally placed for ex: gap
between proj Eng. of project 1 & Proj Eng project 2 is 14 rows.

Jan Feb Mar Apr
Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 5 5 5 5
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 10 10 10 15
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 8 8 8 8
Outside Lab ($'s) 3 3 3 3
Purchased Items ($'s) 2 2 2 2

Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 1 1 1 1
Test Tech (Hrs) 2 2 2 2
Qual Hardware ($'s) 3 3 3 3
No Charge ($'s) 5 5 5 5
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 6 6 6 6

Project:
Proj Eng (Hrs) 2 2 2 2
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 3 3 3 3
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 5 5 5 5
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 9 9 9 9
Project:
.....................
...................





Pete_UK

Summing
 
Glad to hear it - thanks for feeding back.

Which of the formulae did you go with in the end?

Pete

On Nov 5, 11:02 pm, WRC wrote:
Thanks Pete_UK

That is what I wanted..........

Thanks



"Pete_UK" wrote:
Have just replied to your previous post - this has the added dimension
of different months, but the formulae will be similar. Instead of
B1:B1000, adjust this for the column you want to add.


Hope this helps.


Pete


On Nov 5, 10:20 pm, WRC wrote:
Need to add Qual Hardware+No Charge+DAT Hardware+Outside Lab+Purchased Items
for all projects month wise.
All Projects are of same format (i.e they are at equally placed for ex: gap
between proj Eng. of project 1 & Proj Eng project 2 is 14 rows.


Jan Feb Mar Apr
Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 5 5 5 5
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 10 10 10 15
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 8 8 8 8
Outside Lab ($'s) 3 3 3 3
Purchased Items ($'s) 2 2 2 2


Project:
Proj Eng (Hrs) 1 1 1 1
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 1 1 1 1
Test Tech (Hrs) 2 2 2 2
Qual Hardware ($'s) 3 3 3 3
No Charge ($'s) 5 5 5 5
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 6 6 6 6


Project:
Proj Eng (Hrs) 2 2 2 2
Design/Drafting (Hrs) 4 4 4 4
Analysis (Hrs) 3 3 3 3
Test Tech (Hrs) 1 1 1 1
Qual Hardware ($'s) 5 5 5 5
No Charge ($'s) 6 6 6 6
DAT Hardware ($'s) 7 7 7 7
Outside Lab ($'s) 8 8 8 8
Purchased Items ($'s) 9 9 9 9
Project:
.....................
...................- Hide quoted text -


- Show quoted text -





All times are GMT +1. The time now is 02:43 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com