In an array, I need to identify the total number of days and dollars out of
sync if specific conditions are not met. For instance, A report is due on X date but 3 reports later, the dollars were finally correct. I need to calculate the number of days it took to finally get the numbers correct and by how much the numbers were off. I have a spreadsheet with about 300 of these entries and it took anywhere from 2 to 6 reports to get the numbers correct. |
#2
![]()
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
![]()
I think we need some idea of how the data is structured.
-- --- HTH Bob (there's no email, no snail mail, but somewhere should be gmail in my addy) "B" wrote in message ... In an array, I need to identify the total number of days and dollars out of sync if specific conditions are not met. For instance, A report is due on X date but 3 reports later, the dollars were finally correct. I need to calculate the number of days it took to finally get the numbers correct and by how much the numbers were off. I have a spreadsheet with about 300 of these entries and it took anywhere from 2 to 6 reports to get the numbers correct. |
#3
![]()
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
![]()
Sorry, the information is in a row format.
Acc $ Acc Dt 1st $ 1st Dt 2nd $ 2nd Dt 3rd $ 3rd Dt 4500 8/21/02 9800 1/10/03 7800 5/30/04 4500 10/1/06 I need to know how many days it was before the report equaled $4500 (the date that the number was finally reported correctly) and the average amount the numbers were off, until the report was finally done correctly. Thanks. "Bob Phillips" wrote: I think we need some idea of how the data is structured. -- --- HTH Bob (there's no email, no snail mail, but somewhere should be gmail in my addy) "B" wrote in message ... In an array, I need to identify the total number of days and dollars out of sync if specific conditions are not met. For instance, A report is due on X date but 3 reports later, the dollars were finally correct. I need to calculate the number of days it took to finally get the numbers correct and by how much the numbers were off. I have a spreadsheet with about 300 of these entries and it took anywhere from 2 to 6 reports to get the numbers correct. |