ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Worksheet Functions (https://www.excelbanter.com/excel-worksheet-functions/)
-   -   external links (https://www.excelbanter.com/excel-worksheet-functions/11681-external-links.html)

ghoward

external links
 
When I edit external links within excel, I end up with the link showing up as
text in the cell instead of it actually pulling information from the linked
cell. ='[Current Weekly Job Detail.xls]Sheet4'!$C$1 works fine until I
select the cell and edit it to reference Sheet5. Then I just get the formula
itself instead of the value in the linked cell.

Is there a configuration switch that causes this?

Thanks in advance
Greg


Harlan Grove

ghoward wrote...
When I edit external links within excel, I end up with the link

showing up as
text in the cell instead of it actually pulling information from the

linked
cell. ='[Current Weekly Job Detail.xls]Sheet4'!$C$1 works fine until

I
select the cell and edit it to reference Sheet5. Then I just get the

formula
itself instead of the value in the linked cell.

Is there a configuration switch that causes this?


Does this change if you press the [Ctrl]+~ key combination? If not, is
the number format Text?


Dave Peterson

Excel likes to be helpful.

Try this on a new worksheet
Format A1 as a date
put =A1 in B1

format B1 as General
select B1, F2 (to edit) and hit enter.

Excel likes to help!

===
Try the same thing, but this time format A1 as Text.
Select B1, F2 (to edit) and hit enter.

B1 now has a Text format.

===
I don't think you can change excel's behavior. Just change the number format to
what you want and then F2|enter.




ghoward wrote:

When I edit external links within excel, I end up with the link showing up as
text in the cell instead of it actually pulling information from the linked
cell. ='[Current Weekly Job Detail.xls]Sheet4'!$C$1 works fine until I
select the cell and edit it to reference Sheet5. Then I just get the formula
itself instead of the value in the linked cell.

Is there a configuration switch that causes this?

Thanks in advance
Greg


--

Dave Peterson

ghoward

Thanks for the help. It is tiresome but it works.

Greg


"Dave Peterson" wrote:

Excel likes to be helpful.

Try this on a new worksheet
Format A1 as a date
put =A1 in B1

format B1 as General
select B1, F2 (to edit) and hit enter.

Excel likes to help!

===
Try the same thing, but this time format A1 as Text.
Select B1, F2 (to edit) and hit enter.

B1 now has a Text format.

===
I don't think you can change excel's behavior. Just change the number format to
what you want and then F2|enter.




ghoward wrote:

When I edit external links within excel, I end up with the link showing up as
text in the cell instead of it actually pulling information from the linked
cell. ='[Current Weekly Job Detail.xls]Sheet4'!$C$1 works fine until I
select the cell and edit it to reference Sheet5. Then I just get the formula
itself instead of the value in the linked cell.

Is there a configuration switch that causes this?

Thanks in advance
Greg


--

Dave Peterson



All times are GMT +1. The time now is 04:58 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com