Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into Cell
C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should end
up
' with 7. While there, go ahead and enter 7 into the last cell (to replace
the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a control-shift-enter.
The
' first column is a cubic spline interpolation of your data; each subsequent
' column is a higher-order derivative. Of course you dont need to return so
much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the behavior
of the
' fitted function evaluated at that point, select up to 4 contiguous cells
in the
' same row, and go for it. If you want to know some info about one of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using the vb
editor.
When I follow the testing procedure as outline above I end up with #NAME? in
the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob



Bob Phillips[_3_]

getting vb module formulae to work in excel 2003
 
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into Cell
C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to replace
the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to return
so much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the behavior
of the
' fitted function evaluated at that point, select up to 4 contiguous cells
in the
' same row, and go for it. If you want to know some info about one of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using the
vb editor.
When I follow the testing procedure as outline above I end up with #NAME?
in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob




Rick Rothstein

getting vb module formulae to work in excel 2003
 
First question... when you said you "copied and pasted this module into a
new module", did you mean a module that you inserted yourself by clicking
Insert/Module from the VBA menu bar?

--
Rick (MVP - Excel)


"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into Cell
C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to replace
the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to return
so much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the behavior
of the
' fitted function evaluated at that point, select up to 4 contiguous cells
in the
' same row, and go for it. If you want to know some info about one of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using the
vb editor.
When I follow the testing procedure as outline above I end up with #NAME?
in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob



Bob Matthews[_2_]

getting vb module formulae to work in excel 2003
 
Hi Rick
Yes - not expressing myself too well.............
but as you say.....I chose Insert/Module from the VBA menu bar

Bob


"Rick Rothstein" wrote in message
...
First question... when you said you "copied and pasted this module into a
new module", did you mean a module that you inserted yourself by clicking
Insert/Module from the VBA menu bar?

--
Rick (MVP - Excel)


"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in
the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to return
so much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one of
the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using the
vb editor.
When I follow the testing procedure as outline above I end up with #NAME?
in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob





Bob Matthews[_2_]

getting vb module formulae to work in excel 2003
 
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in
the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to return
so much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one of
the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using the
vb editor.
When I follow the testing procedure as outline above I end up with #NAME?
in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob






Bob Phillips[_3_]

getting vb module formulae to work in excel 2003
 
I have just gone and grabbed that function, plugged it into a new module,
and after a few corrections (comments being wrapped around in Google), it
worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in
the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single point, no
problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one of
the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using
the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob








Bob Matthews[_2_]

getting vb module formulae to work in excel 2003
 
Hi Bob

Yes - I got all those wrap around problems sorted

Bob

"Bob Phillips" wrote in message
...
I have just gone and grabbed that function, plugged it into a new module,
and after a few corrections (comments being wrapped around in Google), it
worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You should
end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in
the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single point,
no problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one of
the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using
the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob










Bob Phillips[_3_]

getting vb module formulae to work in excel 2003
 
... and still the problem?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I got all those wrap around problems sorted

Bob

"Bob Phillips" wrote in message
...
I have just gone and grabbed that function, plugged it into a new module,
and after a few corrections (comments being wrapped around in Google), it
worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence the
length.
' If you "know" that input is always valid, set the compiler directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You
should end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns), in
the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single point,
no problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one of
the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using
the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob












Bob Matthews[_2_]

getting vb module formulae to work in excel 2003
 
Yes - afraid so.........

"Bob Phillips" wrote in message
...
.. and still the problem?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I got all those wrap around problems sorted

Bob

"Bob Phillips" wrote in message
...
I have just gone and grabbed that function, plugged it into a new module,
and after a few corrections (comments being wrapped around in Google), it
worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence
the length.
' If you "know" that input is always valid, set the compiler
directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You
should end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns),
in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single point,
no problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one
of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using
the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob














Bob Matthews[_2_]

getting vb module formulae to work in excel 2003
 
Hi Bob

I have sorted out my problems..............

Bob

"Bob Phillips" wrote in message
...
.. and still the problem?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I got all those wrap around problems sorted

Bob

"Bob Phillips" wrote in message
...
I have just gone and grabbed that function, plugged it into a new module,
and after a few corrections (comments being wrapped around in Google), it
worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence
the length.
' If you "know" that input is always valid, set the compiler
directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps). Into
Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You
should end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns),
in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single point,
no problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one
of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003 using
the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob














Bob Phillips[_3_]

getting vb module formulae to work in excel 2003
 
Can you divulge the solution ... for posterity?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

I have sorted out my problems..............

Bob

"Bob Phillips" wrote in message
...
.. and still the problem?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I got all those wrap around problems sorted

Bob

"Bob Phillips" wrote in message
...
I have just gone and grabbed that function, plugged it into a new
module, and after a few corrections (comments being wrapped around in
Google), it worked fine.

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi Bob

Yes - I have the code

Bob

"Bob Phillips" wrote in message
...
Do you have the actual code as well as the comments?

--
__________________________________
HTH

Bob

"Bob Matthews" wrote in message
...
Hi

I am new to this.............so please bear with me :)

I found the following module that starts off as follows:-
------------------------------------------------------------------------------
Option Explicit
' This module contains routines for cubic spline interpolation and
integration.
' Designed for Microsoft Excel 97 and beyond
' Written 1999/6/30, David J. Braden
' Revisions:
' 1999/7/2 DJB Made 2nd derivative at upper endpoint exact
' Tightened up input validation code
' 1999/7/6 DJB Streamlined (optional) error-checking
' About 20% of the code is for checking that input is valid, hence
the length.
' If you "know" that input is always valid, set the compiler
directive
' fValidateInput = True.
' To test:
' Into cells A3:A9, enter 1,2,3,4,5,6,7, and into B3:B9, enter
3,3,1,2,1,3,3.
' Into cell B1 enter =6/49 (we will go from 1 to 7 in 50 steps).
Into Cell C1,
' enter 1; into C2, enter =C1+$B$1, and drag it down to C50. You
should end up
' with 7. While there, go ahead and enter 7 into the last cell (to
replace the
' proximal value). Select D1:G50 (thats right, 50 rows, 4 columns),
in the
' formula bar type =SplineData(A3:B9,C1:C50), and do a
control-shift-enter. The
' first column is a cubic spline interpolation of your data; each
subsequent
' column is a higher-order derivative. Of course you dont need to
return so much
' data. If you want the cubic-spline interpolation at a single
point, no problem:
' specify a single point. If you want more information about the
behavior of the
' fitted function evaluated at that point, select up to 4 contiguous
cells in the
' same row, and go for it. If you want to know some info about one
of the
' derivatives of such a fit, INDEX is very useful. [etc. etc.]
------------------------------------------------------------------------------
I copied and pasted this module into a new module in excel 2003
using the vb editor.
When I follow the testing procedure as outline above I end up with
#NAME? in the D1:G50 grid

Cleary the function SplineData is not being recognised..........

What do I need to do to get it to work?

Bob