Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
Hello all,
I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again. |
#2
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
Have you looked into Conditional Formatting?
wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again. |
#3
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
On Sep 7, 12:05 pm, JW wrote:
Have you looked into Conditional Formatting? wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Yeah i have, but i'm trying to put the code in a module and run a process. Any kind of start will help or any samples where i can modified the code will be great. thanks for the reponse JW |
#5
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
On Sep 7, 1:23 pm, "Don Guillett" wrote:
Try this from your sheet where k1 is the start and L1 is the stop Sub colorrng() With Sheets("sheet9").Columns(1) lr = .Cells(Rows.Count, 1).End(xlUp).Row fd = .Find(Range("k1"), lookat:=xlWhole).Row ed = .Find(Range("L1")).Row .Range(.Cells(1, 1), .Cells(lr, 5)).Interior.ColorIndex = 0 .Range(.Cells(fd, 1), .Cells(ed, 5)).Interior.ColorIndex = 6 End With End Sub -- Don Guillett Microsoft MVP Excel SalesAid Software wrote in message oups.com... Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Hey don, Do you know how i would do it for a date range from sheet 1. i.e. sheet 1 has a date range in column 1 from 8/25/2007-09/01/2007 and in column 2 has a different data, and i want to fill sheet 2 with a certain color if say column 2 contains color code blue and respectively follow by date range? does that make sense thanks. |
#6
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
Are you trying to create a GANTT type layout on sheet2?
Do you have sequential dates at the top of sheet2 in row 1? How do the dates at the top relate to the date ranges - are the dates at the top sequential days? the range 1/1/2007 to 1/7/2007 would be filled in from cells B1 to H1 for example. Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") sh.Cells.Interior.ColorIndex = xlNone r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = 5 sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub If your sheet is set up as I describe and this is what you are trying to do then Test it on a copy of your workbook. -- Regards, Tom Ogilvy " wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again. |
#7
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
On Sep 7, 2:24 pm, Tom Ogilvy
wrote: Are you trying to create a GANTT type layout on sheet2? Do you have sequential dates at the top of sheet2 in row 1? How do the dates at the top relate to the date ranges - are the dates at the top sequential days? the range 1/1/2007 to 1/7/2007 would be filled in from cells B1 to H1 for example. Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") sh.Cells.Interior.ColorIndex = xlNone r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = 5 sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub If your sheet is set up as I describe and this is what you are trying to do then Test it on a copy of your workbook. -- Regards, Tom Ogilvy " wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Hello tom, I just try testing the code you have and i'm getting a run time error 91. r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) That's the code that i'm getting the error at. Can you explain to me the reason for the error just so i know for future reference. Thanks. I enter in some test data in sheet 1. Column A - Start date 01/01/2007 Column B - End Date 01/07/2007 Column C - Test Name Column D - Test Name2 Column E - Color Phases Sheet 2 is already set up with certain colors that have been filled in manually. let me see if i can clear this up a bit more. So what sheet 2 color should fill would be say from 01/01/2007 - 01/07/2007 and the color phase is blue from sheet 1. I guess there should be a range fill for the first 5 days? |
#8
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
A typo.
set sh = worksheets("Sheet2") set r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) ? r.address $A$1:$F$1 and to get the colorindex (a number between 1 and 56 inclusive) from column E Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") ' this line will clear colors in sheet2 so I commented it out. 'sh.Cells.Interior.ColorIndex = xlNone set r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = cell.offset(0,4).Value sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub Again, this is a guess at what you want. -- Regards, Tom Ogilvy " wrote: On Sep 7, 2:24 pm, Tom Ogilvy wrote: Are you trying to create a GANTT type layout on sheet2? Do you have sequential dates at the top of sheet2 in row 1? How do the dates at the top relate to the date ranges - are the dates at the top sequential days? the range 1/1/2007 to 1/7/2007 would be filled in from cells B1 to H1 for example. Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") sh.Cells.Interior.ColorIndex = xlNone r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = 5 sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub If your sheet is set up as I describe and this is what you are trying to do then Test it on a copy of your workbook. -- Regards, Tom Ogilvy " wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Hello tom, I just try testing the code you have and i'm getting a run time error 91. r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) That's the code that i'm getting the error at. Can you explain to me the reason for the error just so i know for future reference. Thanks. I enter in some test data in sheet 1. Column A - Start date 01/01/2007 Column B - End Date 01/07/2007 Column C - Test Name Column D - Test Name2 Column E - Color Phases Sheet 2 is already set up with certain colors that have been filled in manually. let me see if i can clear this up a bit more. So what sheet 2 color should fill would be say from 01/01/2007 - 01/07/2007 and the color phase is blue from sheet 1. I guess there should be a range fill for the first 5 days? |
#9
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
On Sep 7, 3:16 pm, Tom Ogilvy
wrote: A typo. set sh = worksheets("Sheet2") set r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) ? r.address $A$1:$F$1 and to get the colorindex (a number between 1 and 56 inclusive) from column E Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") ' this line will clear colors in sheet2 so I commented it out. 'sh.Cells.Interior.ColorIndex = xlNone set r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = cell.offset(0,4).Value sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub Again, this is a guess at what you want. -- Regards, Tom Ogilvy " wrote: On Sep 7, 2:24 pm, Tom Ogilvy wrote: Are you trying to create a GANTT type layout on sheet2? Do you have sequential dates at the top of sheet2 in row 1? How do the dates at the top relate to the date ranges - are the dates at the top sequential days? the range 1/1/2007 to 1/7/2007 would be filled in from cells B1 to H1 for example. Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") sh.Cells.Interior.ColorIndex = xlNone r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = 5 sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub If your sheet is set up as I describe and this is what you are trying to do then Test it on a copy of your workbook. -- Regards, Tom Ogilvy " wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Hello tom, I just try testing the code you have and i'm getting a run time error 91. r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) That's the code that i'm getting the error at. Can you explain to me the reason for the error just so i know for future reference. Thanks. I enter in some test data in sheet 1. Column A - Start date 01/01/2007 Column B - End Date 01/07/2007 Column C - Test Name Column D - Test Name2 Column E - Color Phases Sheet 2 is already set up with certain colors that have been filled in manually. let me see if i can clear this up a bit more. So what sheet 2 color should fill would be say from 01/01/2007 - 01/07/2007 and the color phase is blue from sheet 1. I guess there should be a range fill for the first 5 days?- Hide quoted text - - Show quoted text - Thanks tom, here's another question if you can help me with. sorry for the trouble. When the code DIM dt1 as date, i ran it through debug and it only shows 12:00am instead of the date value, why does it do that? I think that's why i'm also getting a run-time error of 5. Invalid procedure call or argument. Is that true? |
#10
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
On Sep 7, 3:16 pm, Tom Ogilvy
wrote: A typo. set sh = worksheets("Sheet2") set r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) ? r.address $A$1:$F$1 and to get the colorindex (a number between 1 and 56 inclusive) from column E Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") ' this line will clear colors in sheet2 so I commented it out. 'sh.Cells.Interior.ColorIndex = xlNone set r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = cell.offset(0,4).Value sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub Again, this is a guess at what you want. -- Regards, Tom Ogilvy " wrote: On Sep 7, 2:24 pm, Tom Ogilvy wrote: Are you trying to create a GANTT type layout on sheet2? Do you have sequential dates at the top of sheet2 in row 1? How do the dates at the top relate to the date ranges - are the dates at the top sequential days? the range 1/1/2007 to 1/7/2007 would be filled in from cells B1 to H1 for example. Sub BuildColors() Dim sh As Worksheet, r As Range Dim rng As Range, cell As Range Dim dt1 As Date, dt2 As Date Dim res, res1 Set sh = Worksheets("Sheet2") sh.Cells.Interior.ColorIndex = xlNone r = sh.Range(sh.Range("A1"), sh.Range("B1").End(xlToRight)) With Worksheets("sheet1") Set rng = .Range(.Range("A2"), .Range("A2").End(xlDown)) For Each cell In rng dt1 = .Cells(cell.Row, 1) dt2 = .Cells(cell.Row, 2) res = Application.Match(CLng(dt1), r, 0) res1 = Application.Match(CLng(dt2), r, 0) If Not IsError(res) And Not IsError(res1) Then sh.Range(sh.Cells(cell.Row, res), sh.Cells(cell.Row, res1)) _ .Interior.ColorIndex = 5 sh.Cells(cell.Row, 1).Value = cell.Offset(0, 2).Value _ & " (" & cell.Offset(0, 3).Value & ")" End If Next cell End With End Sub If your sheet is set up as I describe and this is what you are trying to do then Test it on a copy of your workbook. -- Regards, Tom Ogilvy " wrote: Hello all, I'm new to this vba excel. I was wondering if anyone can give me some insight on how i can go about in doing this. I have an excel workbook that contains 2 spreadsheet. Sheet1 contains data to use for sheet2. Sheet1 will have start date, end date, name, country. Sheet2 contains a spreadsheet fill with different colors base on the date range that is given. Right now it's manually being done. Trying to figure out if there was a way for me to take the start date and end date valuse and fill sheet2 with the respective color for that range? Any advice will be appreciated. Thanks again.- Hide quoted text - - Show quoted text - Hello tom, I just try testing the code you have and i'm getting a run time error 91. r = sh.range(sh.range("A1"), sh.range("B1").End(xlToRight)) That's the code that i'm getting the error at. Can you explain to me the reason for the error just so i know for future reference. Thanks. I enter in some test data in sheet 1. Column A - Start date 01/01/2007 Column B - End Date 01/07/2007 Column C - Test Name Column D - Test Name2 Column E - Color Phases Sheet 2 is already set up with certain colors that have been filled in manually. let me see if i can clear this up a bit more. So what sheet 2 color should fill would be say from 01/01/2007 - 01/07/2007 and the color phase is blue from sheet 1. I guess there should be a range fill for the first 5 days?- Hide quoted text - - Show quoted text - Anyone can help? thanks. |