LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 1
Default Cash Flow

I have read a lot, but still can't figure out the best way to do this:

I have 60 cells aligned horizontally: (Jan-05 to Dec-09)
Above the dates I have a project cash flow.

First I need to report the date at the first occurence of cash flow (a
negative number).

Secondly, I need to report the date at the last occurence of cash flow
(a positive number).

This is so I could set up for the XIRR function. The problem is that
the cash flow appears in various dates and durations based on the
project parameters, so I can't lock the XIRR calc to specific cells.

Any help or guidance is greatly appreciated!

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
FV with inconsistant cash flow [email protected] Excel Worksheet Functions 2 February 14th 07 05:33 PM
Cash Flow Lindy-Jane Charts and Charting in Excel 1 November 28th 06 02:19 PM
Cash flow charts Struggling of Essex Excel Discussion (Misc queries) 2 September 28th 05 09:30 PM
Cash Flow Omalley Excel Discussion (Misc queries) 2 July 28th 05 01:16 PM
Cash Flow Set-Up Gary T Excel Worksheet Functions 0 January 13th 05 05:07 PM


All times are GMT +1. The time now is 05:15 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"