Buster

Excel VBA code under MSProject
 
Is it possible to run the following code snippets from a Microsoft Project
Macr? If it is possible to run the code, how might I convert it or make it
run under Project.

I am exporting timescaledata and would like to do some formatting of the
sheet for the user.

Thanks
Jeff

================================================== ==Sub SameAsAbove()
'Any blank cell in column A will be changed to be the same as the cell above
it
Dim LastRow As Long
Dim cell As Range
Dim DataRng As Range
LastRow = Cells(Rows.Count, "b").End(xlUp).Row
Set DataRng = Range("b2:b" & LastRow)
For Each cell In DataRng
If cell = "" Then
cell = cell.Offset(-1, 0)
End If
Next cell
End Sub

================================================== =
Sub Select_Conditional_Rows_WithLoop()

Dim col As Range, cell As Range, rng As Range
Set col = Intersect(ActiveSheet.UsedRange, Columns(1))


For Each cell In col
If Right(cell.Value, 5) = "Total" Then
If Not rng Is Nothing Then
Set rng = Union(cell, rng)
Else
Set rng = cell
End If
End If

Next
rng.EntireRow.Select
Selection.Font.Bold = True
End Sub
=================================================
Sub PrepWork()
Range("A1:A2").Select
Selection.Cut Destination:=Range("B1:B2")
Columns("A:A").Select
Selection.Delete Shift:=xlToLeft
End Sub