LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 2
Default VB timing question

I am writing a VB macro to determine on a daily basis how long it takes product to flow down a production line. I can generate the start and end times for each part form a line computer application. Anybody know a method (piece of code) to compute the difference between both times (but taking out the time it takes when the line is stopped. After 4.30pm in the evenings and Saturdays & Sundays)

I know the "NETWORKDAYS" function can take out whole days, but what about the evenings?

Pls reply to


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Advancing Timing lsmft Excel Discussion (Misc queries) 2 April 9th 06 04:04 PM
Timing a macro ducttape Excel Discussion (Misc queries) 2 February 1st 06 10:23 PM
Timing Chart sveasie Charts and Charting in Excel 1 February 18th 05 02:01 AM
VB Timing Question Pakenn Excel Programming 2 June 15th 04 08:24 AM
Program timing Christof DB Excel Programming 3 October 24th 03 04:56 PM


All times are GMT +1. The time now is 03:42 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"