Hoping someone can please help me....

Running Excel 2003, I have a worksheet, on which each row represents product
shipment data.

L2:L133 represents product shipment date
P1 represents current date
Column O=NETWORKDAYS(L2,,$P$1)-1
To calculate the actual # of days elapsed between shipment and current date.

N2:N133=Shipment value
N134="Total" (name defined)

Q1=SUMIF(O:O,"=12",N2:N133) To obtain shipped total matching or exceeding
12 days.
R1=Q1/Total, to obtain % of total which has met or exceeded 12 days.

Formulas seem to calculate correctly, yet if I go back and "add the shipment
values which match or exceed the desired 12 days, I get a different total,
than the system calculates in Q1.

Any ideas?

TIA,
Sandi
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
complex calculations juliadesi Excel Discussion (Misc queries) 6 March 17th 06 01:14 PM
Calculations based on PivotTable information jerry Excel Discussion (Misc queries) 0 October 3rd 05 07:25 PM
looping through a set of calculations Anand Excel Worksheet Functions 2 September 14th 05 07:12 PM
Calculations crossing multiple sheets Stephen McArthu Excel Discussion (Misc queries) 4 June 6th 05 04:35 PM
time interval calculations in excel Krishna Excel Discussion (Misc queries) 6 April 8th 05 02:57 PM


All times are GMT +1. The time now is 03:12 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"