LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.misc
richarjb
 
Posts: n/a
Default Getting XL to Calc Working Days Lost without using NETWORKDAYS() Function

Has any one got a formulae for calculating working days lost between two
dates without using the NETWORKDAYS() Function. The various attempts I have
made bring in very subtle variances and I have tried everything - I think....

;)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
numerical integration integreat Excel Discussion (Misc queries) 4 May 12th 06 02:40 AM
Lost NETWORKDAYS functionality RC Excel Worksheet Functions 4 March 8th 06 03:55 PM
how to use networkdays returning fractions of days (4.3 days) Chris Excel Worksheet Functions 0 October 6th 05 03:19 PM
MS Excel Function - Networkdays Nilesh Inamdar Excel Worksheet Functions 3 November 26th 04 07:10 PM
Re-assigning weekend days in "Networkdays" Function sts75 Excel Discussion (Misc queries) 0 November 26th 04 10:45 AM


All times are GMT +1. The time now is 08:19 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"