ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Discussion (Misc queries) (https://www.excelbanter.com/excel-discussion-misc-queries/)
-   -   how do i sequence data within a cell (step1,step2,step3) (https://www.excelbanter.com/excel-discussion-misc-queries/85816-how-do-i-sequence-data-within-cell-step1-step2-step3.html)

brunora

how do i sequence data within a cell (step1,step2,step3)
 
i am writing procedures. in some cells i have sequential steps that i
followed, however, i can't list the steps within the cell. I want:
1) The SOV JCL should be created in VM and sent over to the Mainframe to a
unique JCL Library.
2) Edit the SOV JCL according to your testing needs.
3) Save your changes and submit the JCL to run.
4) The job should run successfully with RC= no higher than RC=08.

.... any help out there ?

Kevin B

how do i sequence data within a cell (step1,step2,step3)
 
Press Alt+Enter to insert a new line within a cell.
--
Kevin Backmann


"brunora" wrote:

i am writing procedures. in some cells i have sequential steps that i
followed, however, i can't list the steps within the cell. I want:
1) The SOV JCL should be created in VM and sent over to the Mainframe to a
unique JCL Library.
2) Edit the SOV JCL according to your testing needs.
3) Save your changes and submit the JCL to run.
4) The job should run successfully with RC= no higher than RC=08.

... any help out there ?


brunora

how do i sequence data within a cell (step1,step2,step3)
 
JEEZ!!!
that was easy ... you know how much time i spent - - - how many people i've
asked and how much documentation i went thru - - - and all the failed
attempts !!!
thanks so much ... works like a charm. (why isn't that in any of the docs i
read?)
hmmm

"Kevin B" wrote:

Press Alt+Enter to insert a new line within a cell.
--
Kevin Backmann


"brunora" wrote:

i am writing procedures. in some cells i have sequential steps that i
followed, however, i can't list the steps within the cell. I want:
1) The SOV JCL should be created in VM and sent over to the Mainframe to a
unique JCL Library.
2) Edit the SOV JCL according to your testing needs.
3) Save your changes and submit the JCL to run.
4) The job should run successfully with RC= no higher than RC=08.

... any help out there ?



All times are GMT +1. The time now is 05:05 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
ExcelBanter.com