Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 1
Default How do I create a Work Breakdown Structure (WBS)?

I want to create a WBS using Excel and roll up the effort points.
  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 14
Default How do I create a Work Breakdown Structure (WBS)?

Whoever helped you post this question, have them help you do a google search
on "WBS Excel"

"Brian 76" wrote:

I want to create a WBS using Excel and roll up the effort points.

  #3   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 1
Default How do I create a Work Breakdown Structure (WBS)?

On Dec 4, 10:26*am, Brian 76 <Brian
wrote:
I want to create a WBS using Excel and roll up the effort points.


Be sure you are using the WBS correctly! I cover using excel for this
in my WBS Training at http://WBSCoach.com

Josh Nankivel
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Is there a basic template for a WBS - Work Breakdown Structure? WBS Charts and Charting in Excel 2 April 9th 23 12:50 PM
Is there any way to create a folder structure for tabs in a workbo Curious Excel Discussion (Misc queries) 4 April 2nd 23 08:10 PM
Create Directory Structure from Cell Value. [email protected] Excel Discussion (Misc queries) 0 December 3rd 07 09:02 PM
Work Break Down Structure templet SKN Excel Worksheet Functions 2 August 26th 06 07:01 PM
How 2 breakdown $$$ into $ $ $? mjpage Excel Discussion (Misc queries) 2 January 8th 06 12:16 AM


All times are GMT +1. The time now is 08:34 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"