LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 4
Default Linear Programming via Excel Solver

I have this problem with the solver and especially with the sensitivity
report, which I don't know how to fix. My target function is:

max Z = 16x1 + 16x2 +16x3 + 16x4 + 28x5 + 28x6 + 28x7 + 28x8

but the coefficient 16 is not independent from each variable. In other
terms, I have a cost vector which has the values 16 and 28 in it. And these
values are assigned as mentioned above. But when generating a sensitivity
report every coefficient of the variables is assumed to be independent from
each other. Does anybody know if and how I can block these coefficients, so
that the sensivity report doesn't assume independency?

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Binary integer non-linear programming excel solver premium Gary[_3_] Excel Worksheet Functions 3 September 14th 08 07:58 AM
Binary integer non-linear programming excel solver Gary[_3_] Excel Discussion (Misc queries) 0 September 12th 08 07:38 PM
Binary integer non-linear programming excel solver Gary[_3_] Excel Worksheet Functions 0 September 12th 08 07:35 PM
Binary integer non-linear programming excel solver premium Gary[_3_] Excel Worksheet Functions 0 September 10th 08 06:46 PM
Linear Programming Franklin Excel Discussion (Misc queries) 1 January 22nd 05 09:27 PM


All times are GMT +1. The time now is 10:22 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"