LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Mark_A_Cook
 
Posts: n/a
Default IS THERE A FAST WAY TO CHANGE THE ORDERS OF CONDITIONAL FORMATTIN.

I use conditional formatting in some of my spreadsheets and I noticed that if
the conditions are not in the right order, it doesnt work as well as I would
like. However, I don't know of a way to change the order without deleting
many of the conditions. This is quite troublesome since many of my
conditions have formulas and I have many conditions for the cells. Is there
a fast way to change the order of conditions, without deleating and re-typing
them?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I get the font color to change automatically depending on gtcarlsbad Excel Discussion (Misc queries) 2 February 1st 05 02:39 AM
Use DocProps in a change declaration chris w Excel Worksheet Functions 7 January 21st 05 11:35 PM
how do i make a date change automatically if i change one before . dpl7579 Excel Discussion (Misc queries) 1 January 11th 05 09:21 PM
How to change the default font and size of "comments"? ClayMcQ Excel Discussion (Misc queries) 1 January 7th 05 11:43 PM
Worksheet Row Change event crazybass2 Excel Discussion (Misc queries) 4 December 8th 04 05:29 PM


All times are GMT +1. The time now is 06:32 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"