We are converting to new software and want to import project data from the
old system.

I import the text file (I think its a print file as text) and skip the
first two columns. This eliminates the group headers and leaves me with a
list of cost references that I need to concatenate with a Project Code, ie;
M102 (col A) added to H-003-GM (col B) to become "M102-H-003-GM". Cols C
has the Actual $ and Col D the Budget $. Row 13 has the project actual
revenue in Col B and budget in Col C, but has no reference in Col A, so I
would want to create a temporary one ie; "M102-REV"

Because I've skipped importing the first two group header cols from the text
file, I'm left with the page headers and group footers/totals in Col B & C.

My Questions a

1. The Project Code is not imported due to skipping the first two default
columns so I need to extract the Project Code from the text file before I do
this. Data starts at Row 3 with the words "COMPNAME CONTRACTORS PTY LTD
M102 PROJNAME". (there are 5 spaces between LTD and M102). I need the
M102 which can be more than 4 characters. The first col must be formatted to
text due to some reference codes converting to date (ie; 10-04)

Is it possible to do this and import the Fixed Width text at Col Breaks 42,
60, 78 and 94 using VBA?

2. The text file contains page headers that need to be eliminated. Each
page header is the same as rows 3 to 12. (rows 1 & 2 are blank). There is
also an "**End or Report**" that would need to be deleted.

I would then sort by Col A (now containing only project and reference and
delete any rows after the last reference. These are the group totals with
only $$$'s in col B so Col A will be blank.

The end result is a new list of just reference codes, their actual and
budget. This will be imported into the new software to start the projects
off. Unfortunately, there are dozens of projects so Id like a more
automated way of doing this.

Any help would be appreciated.

--
Jim
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Data Extraction Saxman[_2_] Excel Discussion (Misc queries) 7 July 21st 07 08:04 PM
Complicated extraction of text lohwk Excel Discussion (Misc queries) 7 May 28th 06 09:36 PM
data extraction TUNGANA KURMA RAJU Excel Discussion (Misc queries) 10 February 27th 06 12:25 PM
data extraction Usul New Users to Excel 1 February 16th 06 04:04 AM
Data Extraction Chicken Man Setting up and Configuration of Excel 1 February 24th 05 03:13 AM


All times are GMT +1. The time now is 03:07 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"