ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Discussion (Misc queries) (https://www.excelbanter.com/excel-discussion-misc-queries/)
-   -   Multiplying time by cost (https://www.excelbanter.com/excel-discussion-misc-queries/159644-multiplying-time-cost.html)

kippers

Multiplying time by cost
 
Hi,

I am trying to calculate some activity costs and have some timings that I
want to multiply against some salary costs. The timings on the spreadsheet
are in the format [h]:mm:ss and the costs are per second (as I want to be as
accurate as possible). However, when I multiply [h]:mm:ss by the cost per
second I get a weird answer. e.g.

0:00:30 * 0.50 = 0.25?

I suppose ideally I could do with coverting the [h]:mm:ss into seconds only
(i.e. 0:01:30 would equal 5400)?? so that both data are in seconds??

Any ideas gratefully received!

Cheers,

T. Valko

Multiplying time by cost
 
You have to convert the time to seconds:

=Time * 86400 * multiplier

A1 = 0:00:10
B1 = 10

=A1*86400*B1

Format as GENERAL or NUMBER

Result = 100

--
Biff
Microsoft Excel MVP


"kippers" wrote in message
...
Hi,

I am trying to calculate some activity costs and have some timings that I
want to multiply against some salary costs. The timings on the spreadsheet
are in the format [h]:mm:ss and the costs are per second (as I want to be
as
accurate as possible). However, when I multiply [h]:mm:ss by the cost per
second I get a weird answer. e.g.

0:00:30 * 0.50 = 0.25?

I suppose ideally I could do with coverting the [h]:mm:ss into seconds
only
(i.e. 0:01:30 would equal 5400)?? so that both data are in seconds??

Any ideas gratefully received!

Cheers,




Pete_UK

Multiplying time by cost
 
Yes, times are stored as fractions of a 24-hour day, so to convert to
seconds you would need to multiply as follows:

=A1*B1*24*60*60

where A1 contains your time and B1 your rate.

Hope this helps.

Pete

On Sep 25, 9:58 pm, kippers wrote:
Hi,

I am trying to calculate some activity costs and have some timings that I
want to multiply against some salary costs. The timings on the spreadsheet
are in the format [h]:mm:ss and the costs are per second (as I want to be as
accurate as possible). However, when I multiply [h]:mm:ss by the cost per
second I get a weird answer. e.g.

0:00:30 * 0.50 = 0.25?

I suppose ideally I could do with coverting the [h]:mm:ss into seconds only
(i.e. 0:01:30 would equal 5400)?? so that both data are in seconds??

Any ideas gratefully received!

Cheers,





All times are GMT +1. The time now is 12:44 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com