Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 4
Default how do I change the order of worksheets in a workbook

In Excel 2007, how do I change the order of worksheets in a workbook? In
Excel 2003 I could move the worksheet tabs at the bottom of the workbook
  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 964
Default how do I change the order of worksheets in a workbook

It should be the same as 2003. Either click and drag the worksheet tab to
the desired position, or right-click and select "Move or Copy".

Is the Workbook protected? If so, try unprotecting it (under the Review
Tab) and see if you can move them then.

HTH,
Elkar


"DanielLipkie" wrote:

In Excel 2007, how do I change the order of worksheets in a workbook? In
Excel 2003 I could move the worksheet tabs at the bottom of the workbook

  #3   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 4
Default how do I change the order of worksheets in a workbook

Thanks ... it is protected BUT I entered the correct password to "unprotect"
it when I opened it. The Review |Protected tab has the following checked
- Protect Structure & Windows
- Unrestricted Access

I would have thought this is sufficient to change the worksheet order.

But I did as you suggested ... removed the protection. Then I could
re-order. Then I put protection back on.

Thanks.

"Elkar" wrote:

It should be the same as 2003. Either click and drag the worksheet tab to
the desired position, or right-click and select "Move or Copy".

Is the Workbook protected? If so, try unprotecting it (under the Review
Tab) and see if you can move them then.

HTH,
Elkar


"DanielLipkie" wrote:

In Excel 2007, how do I change the order of worksheets in a workbook? In
Excel 2003 I could move the worksheet tabs at the bottom of the workbook

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I change headers for all worksheets in a workbook? frankfine Excel Discussion (Misc queries) 8 September 18th 08 07:45 PM
How do I change the order of worksheets in a workbook DanielLipkie Excel Discussion (Misc queries) 1 July 9th 07 07:37 PM
how do I change the order of the workbook tabs? PJW Excel Worksheet Functions 2 May 25th 07 08:10 PM
HOW DO I CHANGE THE ORDER OF THE SHEETS IN EXCEL WORKBOOK? joanbaer New Users to Excel 4 August 5th 05 09:23 PM
I want to sort worksheets in a workbook into Alpha order? thecattah Excel Worksheet Functions 1 January 5th 05 07:06 AM


All times are GMT +1. The time now is 03:52 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"