LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 3
Default Project future date w/ 6 day work week and holiday

How can I calculate a future date based on a start date, taking in
consideration holidays?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Formula for a 4 day work week tamarade Excel Worksheet Functions 17 January 10th 07 05:20 AM
how to count easily dribler2 Excel Worksheet Functions 21 January 1st 07 05:33 AM
How do I set up a 6 day work week in Excel? rrichter Excel Worksheet Functions 9 August 13th 06 07:05 PM
Work week holiday for different countries Data_Lisa Charts and Charting in Excel 0 June 7th 06 07:37 PM
how to set a 6-day work week ? RobertH Excel Worksheet Functions 1 February 24th 05 09:25 AM


All times are GMT +1. The time now is 02:27 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"