Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 1
Default Excel 2003 - Calculation production schedule using solver

I had a production schedule for food processing. As same facilities is used,
the different products is run in sequence in batches below timing

A B C D
E
Next Food Next food Next Food Next
Food
5 Current Product Ham Cheese Bread Jam
6 Ham - 2min 4min
3min
7 Cheese 5min - 3min
2min
8 Bread 2 min 4min -
1min
9 Jam 5min 3min 1min -

How do I determine the sequence for the above food order that will minimise
the time taken for exchange products.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Looking for a production schedule excel/access & user friendly? John Setting up and Configuration of Excel 0 February 9th 07 03:17 PM
Production Summary using excel 2003 Matt Excel Discussion (Misc queries) 0 December 22nd 06 02:25 AM
I AM LOOKING FOR A SIMPLE PRODUCTION SCHEDULE FOR MANUFACTURING wayne Excel Discussion (Misc queries) 1 December 18th 05 11:56 PM
Figuring out loop for a production schedule Naji Excel Discussion (Misc queries) 2 October 26th 05 02:45 AM
Formating Dates for production schedule dpl7579 Excel Discussion (Misc queries) 1 January 11th 05 09:43 PM


All times are GMT +1. The time now is 02:52 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"